For the injection molding cycle to begin, four criteria must be met: mold open, ejector pins retracted, shot built, and carriage forward. When these criteria are met, the cycle begins with the mold closing. This is typically done as fast as possible with a slow down near the end of travel. Mold safety is low speed and low pressure mold closing. It usually begins just before the leader pins of the mold and must be set properly to prevent accidental mold damage. When the mold halves touch clamp tonnage is built. Next, molten plastic material is injected into the mold. The material travels into the mold via the sprue bushing, then the runner system delivers the material to the gate. The gate directs the material into the mold cavity to form the desired part. This injection usually occurs under velocity control.When the part is nearly full, injection control is switched from velocity control to pressure control. This is referred to as the pack/hold phase of the cycle. Pressure must be maintained on the material until the gate solidifies to prevent material from flowing back out of the cavity. Cooling time is dependent primarily on the wall thickness of the part. During the cooling portion of the cycle after the gate has solidified, plastication takes place. Plastication is the process of melting material and preparing the next shot. The material begins in the hopper and enters the barrel through the feed throat. The feed throat must be cooled to prevent plastic pellets from fusing together from the barrel heat. The barrel contains a screw that primarily uses shear to melt the pellets and consists of three sections. The first section is the feed section which conveys the pellets forward and allows barrel heat to soften the pellets. The flight depth is uniform and deepest in this section. The next section is the transition section and is responsible for melting the material through shear. The flight depth continuously decreases in this section, compressing the material. The final section is the metering section which features a shallow flight depth, improves the melt quality and color dispersion. At the front of the screw is the non-return valve which allows the screw to act as both an extruder and a plunger.When the screwis moving backwards to build a shot, the non-return assembly allows material to flow in front of the screw creating a melt pool or shot. During injection, the non-return assembly prevents the shot from flowing back into the screw sections. Once the shot has been built and the cooling time has timed out, the mold opens. Mold opening must occur slow-fast-slow. The mold must be opened slowly to release the vacuum that is caused by the injection molding process and prevent the part from staying on the stationary mold half. This is undesirable because the ejection system is on the moving mold half. Then the mold is opened as far as needed, if robots are not being used, the mold only has to open far enough for the part to be removed. A slowdown near the end of travel must be utilized to compensate for the momentum of the mold. Without slowing down the machine cannot maintain accurate positions and may slam to a stop damaging the machine. Once the mold is open, the ejector pins are moved forward, ejecting the part. When the ejector pins retract, all criteria for a molding cycle have been met and the next cycle can begin.

No comments: